City of Colona Public Works Committee will meet June 14.
Here is the agenda provided by the Committee:
Public discussion –
Public works report
1. 2009 International Dump Truck Repair ($670)
2. Shut Off Notices
3. New Backhoe is here
4. Started spraying for Mosquitoes as of June 6th
5. Water Dept will start changing out water meters on route 2
6. Lift stations retro fits 3rd Ave, 8th Ave, 10th Ave. Current operating systems failing.
7. Pump Repair one sewer pump 8th Ave ($1954), one water pump Level Acers ($762).
8. Bar Screen repair cost
Colona Scott Family Park
1. Spare pool pump cost around $1300
2. Fountain cost around $1300
3. Electrical work on Lots 74-97 (under $1000)
4. Electrical work on lots 135-150 (TBD)
5. Pool was shut down on May 31- June 4 by Health Dept.
6. Signage about Quads & UTVs
Public Works
https://www.colonail.com/vertical/sites/%7BFC142F78-E9D2-49AE-8B50-7910B5B74E0C%7D/uploads/06.14.18_PW_Agenda.pdf